A manufacturing IT project contains more than just software. Any project控制工程网版权所有, wheth
Typically, most project artifacts are kept only on desktop systems. At some stage in the project控制工程网版权所有, these artifacts are copied to the target system or to a configuration management system. This is a risky approach because information will then be lost when the project is stopped. This is especially true if the project work is performed by contractors. As they will start looking for the next consulting opportunity once the announcement is made that the project is cancelled. Getting their attention and time to correctly document and save all of their work will be difficult, if even possible. For many projects, once the announcement is made, all outside contractors will be off the site by the end of the day.
The best rule for any project is to capture all project artifacts in common storage and, if possible控制工程网版权所有, place the artifacts in a Controlled configuration management system. If you are following the approach of engineers and programmers working in a local sandbo


在线会议
论坛
专题
工控直播
新闻中心
子站
技术
社区


2026具身智能机器人电子制造应用研讨会
福禄克六大“法宝”帮您搞定过程仪表校准难题
中控时间序列大模型TPT免费有奖体验
爱德克SE2L进阶版安全激光扫描仪有奖预约演示
剑维软件电子半导体行业白皮书有奖下载





















