用户中心

资讯 > 英文资料文献

Successful system integration in a recession: 10 tips

www.cechina.cn2009.05.25阅读 3293

  An economic recession may be the perfect time for smart engineers to upgrade their plants and plan for recovery. While the sales staff works on finding new business, operations and design staff can take the make the most of relatively idle time to retrofit existing machines. Here are 10 steps to success for wisely using a system integrator to help with the hard stuff.

Eliminate<span class=控制工程网版权所有, virtually overnight, problems you have lived with for years with a well planned drive and control system upgrade" src="http://www.cechina.cn/upload/article/4c6b6a8d-0655-42c6-93c6-8fe9bb69a08d/1.jpg">


  Eliminate控制工程网版权所有, virtually overnight, problems you have lived with for years with a well planned drive and control system upgrade
.
  1. Run the retrofitting numbers. Determine the cost-benefit of upgrading your existing equipment vs. buying new. Often the existing machine is sound and you can realize significant benefits with an intelligent control system upgrade. I regularly see throughput benefits of 30%-50% and savings in the hundreds of thousands of dollars after updating control hardware and implementing a better user interface. You can eliminate — virtually overnight — problems that you have lived with for years with a well-planned drive and control system upgrade. Retrofitting a machine will extend a proven asset’s life while improving production rates and reliability.
  2. Involve the integrator early. Good partnerships build success. By involving the integrator early in the evaluation processwww.cechina.cn, you have a better chance of getting the best solution for your production challenges. Good integrators look at the big picture and suggest cost-effective improvements to the entire production line that your team may not have realized were possible. Choose an integrator that you would like a long-term relationship with. They will look out for your best interests and help you achieve your budget targets through effective and experienced design efforts early in the project, instead of cost-cutting and features reductions when the money runs out.
  3. Get the whole package. Make sure your integrator is providing the PLC/motion programming, HMI software design控制工程网版权所有, drives控制工程网版权所有, control hardwarewww.cechina.cn, panel building, field acc
标签:control,
版权声明:版权归控制工程网所有,转载请注明出处!

频道推荐

关于我们

控制工程网 & CONTROL ENGINEERING China 全球工业控制、自动化和仪器仪表领域的先锋媒体

CE全球

联系我们

商务及广告合作
任小姐(北京)                 夏小姐(上海)
电话:010-82053688      电话:18616877918
rendongxue@cechina.cn      xiashuxian@cechina.cn
新闻投稿:王小姐

关注我们的微信

关于我们 | 网站地图 | 联系我们
© 2003-2020    经营许可编号:京ICP证120335号
公安机关备案号:110102002318  服务热线:010-82053688